Skip to calculator

Fundamentals

Load Factor Calculator

Calculate an interval energy-to-peak ratio from consistent measurements.

01 / Inputs

Same-interval measurements

02 / Result

Interval load factor

Enter interval measurements

Average demand = interval energy / interval duration · Load factor = average demand / interval peak demand

Calculated results will appear here.

Method and boundaries

Average demand = interval energy / duration. Load factor = average demand / peak demand from that same interval.

This is not transformer rated-capacity utilization, billing demand, demand factor, diversity factor, utilization factor or equipment efficiency.

FAQ

What does this calculator compute?

Average demand is interval energy divided by interval duration. Load factor is that average demand divided by the peak demand of the same interval.

What is it not?

It is not transformer rated-capacity utilization, billing demand, demand factor, diversity factor, utilization factor, or equipment efficiency.

What has to match?

Energy, duration, and peak demand must describe one interval. Do not mix a monthly energy total with a peak from a different window.

Source records